Field Notes · Step 01 · Scoping
Start with the bills and the breaker panels
Before any hardware goes in, the utility history and the electrical panels decide what is worth measuring.
The proof-of-concept building is a small single-story office served by rooftop heat pumps. The owner asked that nothing already working be disturbed. That request shaped the whole deployment, and it’s the same constraint most owners will set.
What the bills can and can’t say
Scoping starts with the utility history. Monthly bills give the weather sensitivity, the base load and a first read on whether the building is high or low against its peers. They can’t say which equipment drives the numbers, when it runs, or whether it runs when nobody is there. That’s the gap the Digital Mirror™ exists to close, so the bills set the questions and the metering plan answers them.
The panels are the map
The second half of scoping is the electrical distribution. This building has three panels that matter: the main service and two downstream panels, one feeding the other. That hierarchy became the backbone of the metering design, because each level can be checked against the one below it.
Then come the loads worth isolating: the heat pumps, water heating, the EV charger, exterior lighting and plug loads. Each one is on the list because it answers a specific question.
Lessons learned
- Panel directories are often wrong. Here, a breaker listed as spare was installed but carried nothing, and a “water heating” set fed systems furniture. Budget electrician time to verify every circuit you plan to meter.
- Breaker size isn’t load. Ask what runs on a circuit and when. It matters for self-powered sensors.
- Every sensor should answer a specific question. One that doesn’t adds cost without adding information.