Notes from the field
How the first Digital Mirror™ was deployed, step by step, including what didn't go to plan.
-
Step 01 · Scoping
Start with the bills and the breaker panels
Before any hardware goes in, the utility history and the electrical panels decide what is worth measuring.
-
Step 02 · Geometry
From a walkthrough scan to an energy model
A 360° walkthrough became a measured floor plan, and the floor plan became the geometry of the energy model.
-
Step 03 · Validation
Trusting the data before using it
Circuit attribution and physical-plausibility checks are complete. Energy-balance closure against the utility meter is next.
-
Step 04 · Findings
What the building told us before the model did
Before any model was calibrated, the install and the sensor data turned up missing equipment, an unevenly loaded service, an after-hours load pattern and a hot equipment room.